The swimming pool – STUTENSEE
The new-building of swimming pool from the architecture studios 4A
The new-building of swimming pool from the architecture studios 4A
Investor:
The city – Stutensee
Location:
Stutensee (Germany)
Date of construction:
2018
Project in numbers:
370 m² (total area of swimming pool)
6 000 litres (the volume of the buffer tank under the building connected to the heat exchanger)
The scope of the seven year project involved the construction of 11 buildings, which for programme purposes were treated individually even though in reality they were connected. Four of the buildings were required to withstand a Seismic event.
The object is designed as an oblong one floor covered swimming pool divided into 2 individual roof’s cantilevered structures. The special cladding solution – DOMICO, with its unique appearance and striking profiling was fastened with modul strips. The combination of aluminium modules with wooden complements looks naturally and picturesque.