THE FURNACE KASI
The new industrial construction to increase the production of
elements for canalization, CNC systems, etc..
The new industrial construction to increase the production of
elements for canalization, CNC systems, etc..
Investor:
KASI Foundry a.s.
Location:
Chvaletice (The Czech Republic)
Project duration:
09/2018 – 01/2019
Project in numbers :
552 m³ (total amount of concrete)
84 tons (total weight of reinforcement)
2 628 m² (total area of formwork)
The scope of the the project – KASI foundry for international investors involved a special construction of furnace inside the object. The building was oblong in shape just within few months despite the space limitation. As the works were carried out within a narrow conditions, transport concrete into the formwork was necessary to utilise a crane travel fitted on the precast columns.
The object was built as a precast skelet with inner monolithic walls. All structures were casted by concrete with high level of strength in order to withstand the resistance against a permanent increased temperature. Technically the most demanding part of the project was coordination and cooperation with other companies on the small space.